Final for Publication
ORDINANCE
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CHICAGO:
SECTION 1: Title 17 of the Municipal Code of Chicago, Chicago Zoning Ordinance, is amended by changing all the Waterway-Business Planned Development 1369 symbols and indications as shown on Map No. 1-F in the area bounded by:
West Randolph Street; North Wacker Drive; West Washington Street and the east bank of the south branch of the Chicago River,
to those of a Waterway-Business Planned Development 1369, as amended which is
hereby established in the area described, subject to such use and bulk regulations as are
set forth in the Plan of Development attached herewith and made a part thereof and to
no others.
SECTION 2: This ordinance shall take effect upon its passage and due publication.
Address: HON. Wacker Drive
43520018;!
Final for Publication
WATERWAY-BUSINESS PLANNED DEVELOPMENT NO. 1369, AA PLANNED DEVELOPMENT STATEMENTS
The area delineated herein as Waterway-Business Planned Development Number 1369, (Planned Development) consists of approximately 44,480 square feet of property, which is depicted on the attached Planned Development Boundary and Property Line Map (Property) and is owned or controlled by the Applicant, 110.North Wacker Titleholder, LLC.
The requirements, obligations and conditions contained within this Planned Development shall be binding upon the Applicant, its successors and assigns and, if different than the Applicant, the legal title holders and any ground lessors. All rights granted hereunder to the Applicant shall inure to the benefit of the Applicant's successors and assigns and, if different than the Applicant, the legal title holder and any ground lessors. Furthermore, pursuant to the requirements of Section 17-8-0400 ofthe Chicago Zoning Ordinance, the Property, at the time of application for amendments, modifications or changes (administrative, legislative or otherwise) to this Planned Development are made, shall be under single ownership or designated control. Single designated control is defined in Section 17-8-0400.
All applicable official reviews, approvals or permits are required to be obtained by the Applicant or its successors, assignees or grantees. Any dedication or vacation of streets or alleys or grants of easements or any adjustment of the right-of-way shall require a separate submittal to the Department of Transportation on behalf of the Applicant or its successors, assigns or grantees.
Any requests for grants of privilege, or any items encroaching on the public way, shall be in compliance with the Planned Development.
Ingress or egress shall be pursuant to the Planned Development and may be subject to the review and approval of the Departments of Planning and Development and Transportation. Closure of all or any public street or alley during demolition or construction shall be subject to the review and approval of the Department of Transportation.
All work proposed in the public way must be designed and constructed in accordance with the Department of Transportation Construction Standards for Work in the Public Way and in compliance with the Municipal Code of Chicago. Prior to the issuance of any Part II approval, the submitted plans must be approved by the Department of Transportation.
This Plan of Development consists of Seventeen Statements: a Bulk Regulations Table; an Existing Zoning Map; an Existing Land-Use Map; a Planned Development Boundary and Property Line Map; Site Plan; Composite Landscape Plan; Riverwalk Plan; Lower Level Floor Plans; .a Green Roof Plan; Building Section Plan and Building Elevations (North, South, East and West) prepared by Goettsch Partners - Architects and dated November 15, 2018, submitted herein. Full-sized copies of the Site Plan, Landscape Plan and Building Elevations are on file with the Department of Planning and Development. In any instance where a provision of this Planned Development conflicts with the Chicago Building Code, the Building Code shall control. This Planned Development conforms to the intent and
Applicant 110 North Wacker Titleholder, LLC
Address 110 N Wacker Drive
Introduced September 20, 2018
Plan Commission November 15,2018
purpose of the Chicago Zoning Ordinance, and all requirements thereto, and satisfies the established criteria for approval as a Planned Development. In case of a conflict between the terms of this Planned Development Ordinance and the Chicago Zoning Ordinance, this Planned Development shall control.
The following uses are permitted in the area delineated herein as the Planned Development: office, eating and drinking establishments, outdoor patio, food and beverage retail sales and retail sales, financial services, fitness facilities, accessory parking, co-located wireless communication facilities, boat dock and related and ancillary uses.
On-Premise signs and temporary signs, such as construction and marketing signs, shall be permitted within the Planned Development, subject to the review and approval of the Department of Planning and Development. Off-Premise signs are prohibited within the boundary ofthe Planned Development.
For purposes of height measurement, the definitions in the Chicago Zoning Ordinance shall apply. The height of any building shall also be subject to height limitations, if any, established by the Federal Aviation Administration.
The maximum permitted floor area ratio (FAR) for the Property shall be in accordance with the attached Bulk Regulations and Data Table. For the purpose of FAR calculations and measurements, the definitions in the Zoning Ordinance shall apply. The permitted FAR identified in the Bulk Regulations and Data Table has been determined using a net site area of 44,480 square feet and a base FAR of 16.00.
The Applicant acknowledges that the project has received a bonus FAR of 21.10, pursuant to Sec. 17-4-1000 ofthe Zoning Ordinance. With this bonus FAR, the total FAR for the Planned Development is 37.10. ln exchange for the bonus FAR, the Applicant is required to make a corresponding payment, pursuant to Sections 17.4-1003-B & C, prior to the issuance of the first building permit for any building in the Planned Development; provided, however, if the Planned Development is constructed in phases, the bonus payment may be paid on a pro rata basis as the first building permit for each subsequent new building or phase of construction is issued. The bonus payment will be recalculated at the time of payment (including partial payments for phased developments) and may be adjusted based on changes in median land values in accordance with Section I7-4-1003-C.3
The bonus payment will be split between three separate funds, as follows: 80% to the Neighborhoods Opportunity Fund, 10% to the Citywide Adopt-a-Landmark Fund and 10% to the Local Impact Fund, pursuant to Section 17-4-1003-D. Such funds will be utilized pursuant to Section 17-4-1004-B (Neighborhoods Opportunity), Section 17-4-1006-C (Citywide Adopt-a-Landmark) and Section 17-4-1005-C (Local Impact)
Upon review and determination, Part II Review, pursuant to Section 17-13-0610, a Part II Review Fee shall be assessed by the Department of Planning and Development. The fee, as determined by staff at the time, is final and binding on the Applicant and must be paid to the Department of Revenue prior to the issuance of any Part II approval.
Introduced
Plan ComlTlisston,
Applicant 110 North Wacker Titleholder, LLC
Address HON Wacker Drive
September 20,2018 November 15,2018
Final for Publication
The Site and Landscape Plans shall be in substantial conformance with the Landscape Ordinance and any other corresponding regulations and guidelines, including Section 17-13-0800. Final landscape plan review and approval will be by the Department of Planning and Development. Any interim reviews associated with site plan review or Part 11 reviews, are conditional until final Part II approval.
The Applicant shall design and construct the open space plaza depicted in the attached exhibit to this Planned Development labeled the Composite Landscape Plan (hereinafter the "Plaza"), and shall be responsible to assure that the Plaza is clean, litter free and clear of snow and debris and that any landscaping or plant material is in a healthy condition. The Plaza shall be open to the public daily from 6:00 am to 11:00 pm. The Applicant agrees to cooperate with the City to permit the installation of mutually-approved public art or sculpture within the Plaza in a mutually agreed upon location in the general area of the northeast corner ofthe site.
The Applicant shall comply with Rules and Regulations for the Maintenance of Stockpiles promulgated by the Commissioners of the Departments of Streets and Sanitation, Fleet and Facility Management and Buildings, under Section 13-32-085, or any other provision ofthe Municipal Code of Chicago.
The terms and conditions of development under this Planned Development ordinance may be modified administratively, pursuant to Section 17-13-0611-A, by the Zoning Administrator upon the application for such a modification by the Applicant, its successors and assigns and, if different than the Applicant, the legal title holders and any ground lessors. The applicant and the city of Chicago agree to cooperate to design a mutually acceptable future access to and from the street level riverwalk deck and the river level dock space when a river level riverwalk connection is made to the river level dock space from the adjacent properties to improve connectivity and access for the site, which does not adversely affect the building operations or security; such modifications that result from these discussions shall be made pursuant to Section 17-13-0611.
The Applicant acknowledges that it is in the public interest to design, construct and maintain the project in a manner which promotes, enables and maximizes universal access throughout the Property. Plans for all buildings and improvements on the Property shall be reviewed and approved by the Mayors Office for People with Disabilities to ensure compliance with all applicable laws and regulations related to access for persons with disabilities and to promote the highest standard of accessibility.
The Applicant acknowledges that it is in the public interest to design, construct, renovate and maintain all buildings in a manner that provides healthier indoor environments, reduces operating costs and conserves energy and natural resources. The Applicant shall obtain the number of points necessary to meet the requirements of the Chicago Sustainable Development Policy, in effect at the time the Part II review process is initiated for each improvement that is subject to the aforementioned Policy and must provide documentation verifying compliance.
Applicant 110 North Wacker Titleholder, LLC'
Address 110 N Wacker Drive
Introduced September 20. 2018
Plan Commission November 15. 2018
------4nnal-for:-Publication--" ^
The Applicant acknowledges the importance of the Chicago River as a resource for both commerce and recreation and also acknowledges the City's goals of improving the appearance, quality and accessibility of the river, as contained in the waterway planned development guidelines contained in the Zoning Ordinance (Section 17-8-0912) and the Chicago River Corridor Design Guidelines and Standards. To further these goals, the Applicant agrees to: (a) provide a landscaped 60 foot high arcaded street level river setback and continuous riverwalk that is between 25' and 45' as indicated on the Site Plan and Composite Landscape Plan ("Street Level Riverwalk Deck"); and (b) permit connection by others to the property's river level dock space to the setback and riverwalks of adjacent properties when the river edges of the adjacent properties are similarly improved. The Street Level Riverwalk Deck and river level dock space when connected to adjacent properties shall be un-gated and access thereto open to the public free of charge with signage indicating that the Street Level Riverwalk Deck is open to the public daily from 6:00 am to 11:00 pm. All improvements within the Street Level Riverwalk Deck and river level dock space setback must be substantially completed prior to receipt of a final Certificate of Occupancy for the principal building, provided that planting may be delayed, if consistent with good landscape practice, but not longer than one year following receipt of the occupancy certificate.
This Planned Development shall be governed by Section 17-13-0612. Should this Planned Development ordinance lapse, the Commissioner of the Department of Planning and Development shall initiate a Zoning Map Amendment to rezone the property to the Waterway-Business Planned Development dated February 28, 2018.
Applicant 110 North Wacker Titleholder, LLC
Address HON Wacker Drive
Introduced September 20, 2018
Flan Commission November 15, 2018
Final for Publication
Waterway-Business Pjanned Development No. 1369 Bulk Regulations And Data Table
Gross Site Area:
Area in Adjoining Right-of-Way:
Net Site Area:
Base Floor Area Ratio (FAR): Bonus Floor Area Ratio (FAR): Total Maximum FAR:
Maximum Accessory Parking Spaces: Minimum Bike Parking Spaces: Minimum Periphery Setbacks: Maximum Building Height: Minimum Off-Street Loading Berths:
133,088 square feet (3.05528 acres) 88,608 square feet (2.03416 acres) 44,480 square feet (1.02112 acres) 16 (711,680 square feet) 21.10 (938,320 square feet) 37.10 (1,650,000 square feet)
87 spaces 25 bike spaces Per Site Plan 830 feet
4 (10 feet by 25 feet)
Goettsch Partners - Architects
224 S Michigan Ave Floor 17
Chicago IL 60604
Applicant 110 North Wacker Titleholder, LLC Address 110 N. Wacker Drive
110 NORTH WACKER DRIVE
BULK TABLE
INTRODUCED SEPTEMBER 20. 201 CPC DATE NOVEMBER 18,201
Final for Publication
Goettsch Partners - Architects
224 S Michigan Ave Floor 17
Chicago IL 60604
Applicant' 110 North Wacker Titleholder, LLC Address. 110 N Wacker Drive
110 NORTH WACKER DRIVE
EXISTING ZONING MAP
INTRODUCED SEPTEMBER 20. 20181 CPC DATE NOVEMBER 15, 2018
swap
:ii tor Publication
Goettsch Partners - Architects
224 S Michigan Ave Floor 17
Chicago IL 60604
Applicant 110 North Wacker Titleholder, LLC Address 110 N Wacker Drive
110 NORTH WACKER DRIVE
EXISTING LAND USE MAP EXISTING CONDITIONS
INTRODUCED SEPTEMBER 20, 2018 CPC DATE NOVEMBER 15. 2018
Goettsch Partners - Architects
224 S Michigan Ave. Floor 17
Chicago IL 60604
Applicant 110 North Wacker Titleholder, LLC Address 110 N Wacker Drive
110 NORTH WACKER DRIVE
PLANNED DEVELOPMENT BOUNDARY
PD-001 & PROPERTY LINE MAP
I LJ \J\J I INTRODUCED SEPTEMBER 20 2018
CPC DATE NOVEMBER 15^2018
Goettsch Partners - Architects
224 S Michigan Ave Floor 17
Chicago IL 60604
Applicant. 110 North Wacker Titleholder, LLC Address 110 N Wacker Drive
110 NORTH WACKER DRIVE
SITE PLAN
INTRODUCED SEPTEMBER 20, 2018 CPC DATE NOVEMBER 15. 2018
bridge HoysEV*";v,;"-^h-'iv':'^^!^
STAIR ACCESS FROM ' "'' M -Jff^lf
RANDOLPH STREET^;: / ¦ " PLANTER WTH:m'|x''OF-^-';-;^
RIVERWALK S10NF PAVING; TYP. ,
EDGE OF :.A?': '!,
TOWER ABOVE V-.
UNDERTHE.BUILDING
OVERHANGf^ST^jp;876SF^;n
42" HEIGHT-'
RAILING TYP,
SOUTH branch of ;
THE CHICAGO RIVER :
sir
.-%=4r
GLASS WALL
WITH FRIT.PATTERN £.'>>; 18" HEIGHT-SEATING/^:;'
PLANTER WTHli/IIX'OF
SHRUBS, PERENNIALS AND SEASONAL FLOWERS': ¦ •(
FULL HEIGHT GL'ASS'WALL'
AT ELEVATOR VESTIBULE ;
SLOPED ACCESS FROM -' sf^U-!-WASHINGTON STREET •" ' ^d*^ ' (120 MAX.)
POTENTIAL LOCATION OF .-. ^^I^^jr^ jl!
P0SSI5LE PUBLIC.ELEVATOR ,$/p£ EXISTIN6 -l ?'d$dk tif">^k% |
BRIDGE-'tieBSE^^ SITE AREA 44,480 SF
TOTAL ENCLOSED AREA (BUIL^INGM2^^50iO%)^w TOTAL OPEN AREAjfVEGETATED+HARDSCAPEn:^". V-' '. . =8,740+13,405=22,145 SF (50,0%) '
TOTAL BUILDING OVERHANG AREA(WEST+EAST) =13,611 SF -
dlsASS WALli
•^AT RETAIL
PARKWAY. PLANTERS
WITH SEASONAL FLOWERS, .TYP!.
-I -±»
•'1 f
STONE:. If
PAVlNG;;TYP.ft!
n upper #;
WACKER DR^
IS-
I,1*' 4',V',
GLASS WALL
'„;.' AT MAIN LOBBY;
: i-i^^:.y;
.GLASS^/VAlife
AT RETAIL
-i - UNDFR THE BUILDING .qVERjjANG(F.AST):3,075 SF
¦42-e-
RELOCATED';
DIWY STATION':.
¦l.ine:of
"-- .BUILDING ABOVE o , 15. . 30. ¦' proper IY LINE i::::"—¦ i
Goettsch Partners - Architects
224 S Michigan Ave Floor 17
Chicago IL 60604
Applicant 110 North Wacker Titleholder, LLC Address: 110 N Wacker Drive
110 NORTH WACKER DRIVE
SITE PLAN
INTRODUCED SEPTEMBER 20, 2018 CPC DATE NOVEMBER 15. 2018
Goettsch Partners - Architects 224 S Michigan Ave Floor 17 Chicago IL 60604 Applicant 110 North Wacker Titleholder, LLC Address 110 N Wacker Drive 110 NORTH WACKER DRIVE Dn in< LOWER LEVEL 2 PLAN rU- I LW INTRODUCED SEPTEMBER 20. 2018 CPC DATE. NOVEMBER 15. 2018
W RAN DOLRH ST
l FVEL 56 ROOF
«. ,
GROSS ROOF AREA 40,740 SF ESTIMATED NET ROOF AREA, 31.251.SF. ESTIMATED GREEN ROOF AREA: 15.712 SF
W.WASHINGTON ST
?
60'
ZD
CD
v ' NOTE: FINAL SHAPES OF GRFEN SPACE TBC
".' ' 0 15' 30'
u.:. ,. _^ PROPERTY LINE > I -1 ¦ . ,
1 (SHALL BE 50% OF NET ROOF AREA)
Goettsch Partners - Architects 224 S Michigan Ave Floor 17 | Chicago IL 60604 Applicant 110 North Wacker Titleholder, LLC Address 110 N Wacker Drive 110 NORTH WACKER DRIVE GREEN ROOF PLAN PD-10b INTRODUCED SEPTEMBER 20, 20181 CPC DATE NOVEMBER 15, 2018|
hnai for Publication!
PODIUM ENLARGED SECTIONS 1
PODIUM ENLARGED SECTIONS 2
0 10' 25' 50' 75'
Goettsch Partners - Architects
224 S Michigan Ave Floor 17
Chicago IL 60604
Applicant 110 North Wacker Titleholder, LLC Address 110 N Wacker Drive
110 NORTH WACKER DRIVE
WEST-EAST PODIUM SECTIONS
INTRODUCED SEPTEMBER 20. 2018 CPC DATE NOVEMBER 15, 2018
Goettsch Partners - Architects
224 S Michigan Ave Floor 17
. Chicago IL 60604
Applicant 110 North Wacker Titleholder, LLC Address 110 N Wacker Drive
110 NORTH WACKER DRIVE
WEST ELEVATION
INTRODUCED SEPTEMBER 20, 20181 CPC DATE NOVEMBER 15, 2018
rinai tor PUDiicaiion
iii! ffislSslts!
ieii!!l!!!l!5!!I!!!S!!!!!ll!l!!!liilli!li!illi IS
110 NORTH WACKER DRIVE
iiiiiiiiiiiiHiiiiii!iii!iiiiii!|i|!!!ii!!!l!!!!!!!i!!
Applicant 110 North. Wacker Titleholder, LLC Address 110 N Wacker Drive
EAST ELEVATION
INTRODUCED SEPTEMBER 20. 20181 CPC DATE NOVEMBER 15, 20181
. to penthouse;'
B30.tr
796" -9" ' /ROOF:.
72ff-CT
705 -0" . 151
6761-:
:^.;-.663--v0*';, ^ '"-'46 *¦ ' .
3§iigigi3§IigiSiiiiiIipi§li ilB5i!li5iil§Bi!!i!ii§aal!§i
SPANDREL GLASS ' ':• , ;, ¦
COLOR COATED GLASS SHADOW BOX .7 PANEL TO MATCH VISION GLASS ¦, j -
¦ HIGH PERFORMANCE VISION GLASS, • CUSTOM UNITIZED CURTAINWALL SYSTEMS WITH INSULATED HiGH PERFORMANCE :1 i GLASS UNIT ' ' .V -:!
Goettsch Partners - Architects 224 S Michigan Ave Floor 17 Chicago IL 60604 Applicant 110 North Wacker Titleholder, LLC Address 110 N Wacker Drive 110 NORTH WACKER DRIVE Pn ^DC; NORTH ELEVATION rU-OUO INTRODUCED SEPTEMBER 20 ?018 CPC DATE NOVEMBER 15! 2018
Goettsch Partners - Architects
224 S Michigan Ave Floor 17
Chicago IL 60604
Applicant 110 North Wacker Titleholder, LLC Address 110 N Wacker Drive
110 NORTH WACKER DRIVE
ARCHITECTURAL LOUVER MFTAi LOUVhRS AT
mechawicalfloor';
COLUMN CLADDING : COLUMN COVERS-:
LOBBY FACADE .-J* CLEAR LOBBY GLASS WALL
STOREFRONT GLASS ; INSULATED HIGH PERFORMANCE • GLASS WITH NEUTRAL COATING ;, „Vs«'*
DWARF FOTHERGILLA
Goettsch Partners - Architects
224 S Michigan Ave Floor 17
Chicago IL 60604
Applicant HH Wacker Acquisition Company. LLC Address 3355 Noel Rd, Dallas, TX 75240
110 NORTH WACKER DRIVE
TREE AND SHRUB
INTRODUCED SEPTEMBER 20. 2018 CPC DATE NOVEMBER 15. 2018
Final for Publication
DWARF FOUNTAIN GRASS
LADY'S MANTLE
PERENNIAL GERANIUM CORAL BELLS
MIXED ANNUALS
Goettsch Partners - Architects
224 S Michigan Ave Floor 17
Chicago IL 60604
Applicant" HH Wacker Acquisition Company, LLC Address 3355 Noel Rd, Dallas, TX 75240
110 NORTH WACKER DRIVE
Dn I fl"? PERENNIALS AND SEASONAL FLOWERS
I U-LUO INTRODUCED SEPTEMBER 20.2018
CPC DATE NOVEMBER 15. 2016
VARIES 14'-10" TO l5'-2"
SECTION THROUGH PARKWAY PLANTER
SCALE 1/8- = r-O"
SECTION THROUGH RIVER PROMENADE
SCALE l/B" = r-0-
Goettsch Partners - Architects
224 S Michigan Ave Floor 17
Chicago IL 60604
Applicant HH Wacker Acquisition Company, LLC Address. 3355 Noel Rd, Dallas, TX 75240
. 110 NORTH WACKER DRIVE
SECTIONS
INTRODUCED SEPT EMBER 20, 2018 CPC DATE NOVEMBER 15, 2018