Record #: O2018-9494   
Type: Ordinance Status: Passed
Intro date: 12/12/2018 Current Controlling Legislative Body: Committee on Transportation and Public Way
Final action: 1/23/2019
Title: Canopy(s) for TCF National Bank-Branch
Sponsors: Hopkins, Brian
Topic: PUBLIC WAY USAGE - Canopies
Attachments: 1. O2018-9494.pdf
ORDINANCE
TCF NATIONAL BANK - BRANCH Acct. No. 79381 - 48 Permit No. 1136695

Be It Ordained by the City Council of the City of Chicago:
SECTION 1. Permission and authority are hereby given and granted to TCF NATIONAL BANK - BRANCH, upon the terms and subject to the conditions of this ordinance to maintain and use, as now constructed, three (3) Canopy(s) projecting over the public right-of-way adjacent to its premises known as 1400 W. Fullerton Ave
Said Canopy(s) at W. Fullerton measure(s):
One (1) at twenty-three point six seven (23.67) feet in length, and two (2) feet in width for a total of forty-seven point three four (47.34) square feet.
Said Canopy(s) at N. Southport measure(s):
One (1) at twenty-four point three three (24.33) feet in length, and one point five (1.5) foot in width for a total of thirty-six point five (36.5) square feet.
One (1) at fifteen (15) feet in length, and one point five (1.5) foot in width for a total of twenty-two point five (22.5) square feet.
The location of said privilege shall be as shown on prints kept on file with the Department of Business Affairs and Consumer Protection and the Office of the City Clerk.
Said privilege shall be constructed in accordance with plans and specifications approved by the Zoning Department -Signs.
This grant of privilege in the public way shall be subject to the provisions of Section 10-28-015 and all other required provisions of the Municipal Code of Chicago.
The grantee shall pay to the City of Chicago as compensation for the privilege #1136695 herein granted the sum of one hundred fifty ($150.00) per annum in advance.
A 25% penalty will be added for payments received after due date.
The permit holder agrees to hold the City of Chicago harmless for any damage, relocation or replacement costs associated with damage, relocation or removal of private property caused by the City performing work in the public way.
Authority herein given and granted for a period of five (5) years from and after 10/01/20...

Click here for full text