Record #: O2018-5449   
Type: Ordinance Status: Passed
Intro date: 6/27/2018 Current Controlling Legislative Body: Committee on Transportation and Public Way
Final action: 7/25/2018
Title: Grant(s) of privilege in public way for BP Pipelines (North America), Inc.
Sponsors: Sadlowski Garza, Susan
Topic: PUBLIC WAY USAGE - Grants of Privilege
Attachments: 1. O2018-5449.pdf
ORDINANCE
BP PIPELINES (NORTH AMERICA) INC. Acct. No. 374680 - 1 Permit No. 1131984

Be It Ordained by the City Council of the City of Chicago:
SECTION 1. Permission and authority are hereby given and granted to BP PIPELINES (NORTH AMERICA) INC., upon the terms and subject to the conditions of this ordinance to maintain, operate and use, as now installed one(1) private Pipe Line(s) for the transmission of refined petroleum products. The design, construction, testing, operation and maintenance of said pipeline shall fully comply with the provisions of Federal Regulations Title 49 Transportation; the Department of Transportation; Part 195 Transportation of Liquids by Pipeline. Said carrier pipeline is constructed of steel and have for following specifications; under the public right-of-way adjacent to its premises known as 13400 S. Torrence Ave.
All roads crossings shall use eight and five-eights (8-5/8) inch outside diameter carrier pipe of specifications and grade API 5 LX 42 having a wall thickness of zero and two hundred nineteen thousandths (0.219) inch mill coated with forty (40) mil x-Tru coat on the outside of pipe.
The casing pipe shall be twelve and three fourths (12-3/4) inch outside diameter specification and grade API 5L Grade B having a wall thickness of zero and two hundred fifty thousandths (0.250) inch. The casing shall have API approved flexible casing seals of neoprene at either ends of the section under City of Chicago street crossings with proper ventilation. The pipe will be bored from bore pits located outside the right-of-way lines and then the carrier pipe will be installed by Cradle and Pull method. There shall be no servicing of the pipeline from the roadway, shoulders or ramps of fully access controlled highways and traffic will not be obstructed.
The origin point will maintain constant surveillance of the entire line operation through a Telemeter System in order to be able to shut down all pumping equipment via the Supervisory Control Syst...